ALLOY STEEL PIPING FABRIATION -BOILER COMPONENTS – FOR BHEL LTD
Extremely stringent process for Thermal Projects. Process takes 48 hrs of continuous operation.
The previous firm that qualified this process took over 6 months. ISAN Team qualified in 48 hrs.
Material: Alloy steel P 91, P12 & P 22
(i) P 91 fabrication in progress
(ii) P 91 fabricated Tee ready to dispatch