Renewal of Air-conditioning system onboard ‘Kilo Class’ Submarines

Air Conditioning System  Augmentation

TITANIUM TURNKEY PROJECT

Click to view AIR CONDITIONING SYSTEM

Material – Titanium Gr 9 and CA 104

This project involved removal of the existing system, designing, preparing templates, forging, machining and manufacturing of on line fittings, installation on-board, testing & tuning, guarantee. The video displays the following in progress:-

(i)                 Forging of Ti Gr 2 valves in progress

(ii)                Machining of Ti Gr 2 valve

(iii)              Testing of Flanges Ti Gr 9 – DP and UT  testing

(iv)              Marking and ready to dispatch on line fittings Ti Gr 9 & CA 104

(v)                Installation on-board

This entry was posted in ISAN - Projects Executed. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

Your email is never published nor shared. Required fields are marked *

You may use these HTML tags and attributes <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

*
*